a blog...

16th September 2011

Post

Foam in MBR odour ductwork at GWF

Here are two videos that I took of the foam in the odour ductwork on the industrial membrane bioreactor at Gippsland Water Factory. It’s incredible to see how high up the foam gets in the ductwork and how even with the water sprays on, the foam is still noticeable. First video is of the water sprays in the ductwork off, second with water sprays on.

Tagged: work